Installation de production confidentielle

Installation de production confidentielle

CLIENT

Confidential

ADRESSE

Confidential

APERÇU DU PROJET

Construction of a cold storage warehouse into a state-of-the-art production brewery.

TAILLE DU PROJET

100,000 SF

DATE D'ACHÈVEMENT

2019

Helios partnered with a confidential client to manage the preconstruction and subsequent construction for their new production facility.

Helios did the planning for the production facility in just a couple of months before construction began. Construction consisted of the conversion of an existing cold storage facility for brewery production. We replaced the existing slab with a sloped, reinforced slab with new trench drains throughout. Helios coordinated the extensive process piping systems with the German brewhouse and packaging manufacturers using laser scanning and BIM technologies, allowing for seamless installation. 

Principales caractéristiques

  Conversion of existing cold storage facility for brewery production

  Seamless installation of extensive process piping systems using laser scanning and BIM technologies